{
  "created_utc": "2026-10-15T05:43:14.463007+00:00",
  "events": [
    {
      "event_id": "401872995",
      "risks": [
        {
          "severity": "HIGH",
          "risk": "Denver secondary and Seattle linebacker replacement effects remain unresolved",
          "detail": "Surtain and Hufanga are out, Moss is questionable, and Tyrice Knight replaces Drake Thomas. Coverage, pressure and field-position effects could change opponent scoring, but no supported point conversion exists. Live selections remain PASS.",
          "markets": [
            "winner",
            "spread",
            "total"
          ],
          "resolved": false
        },
        {
          "severity": "HIGH_IF_NOT_ROBUST",
          "risk": "Seattle running-back overlap and Denver receiver materiality",
          "detail": "Test Seattle deductions of zero, three and six points and Denver deductions of zero and three points. The six-point Seattle endpoint assumes distinct lost workloads; it is not automatic injury headcount. Ordinary stress and high-risk gates still apply.",
          "markets": [
            "winner",
            "spread",
            "total"
          ],
          "resolved": false
        }
      ]
    },
    {
      "event_id": "401862800",
      "risks": [
        {
          "severity": "HIGH",
          "risk": "Spalding return and replacement workload remain unresolved",
          "detail": "The established receiver has a documented prior injury absence. Preserve baseline and conditional minus-three scores. Current final availability and the future target allocation are not certified; live selections remain PASS.",
          "markets": [
            "winner",
            "spread",
            "total"
          ],
          "resolved": false
        }
      ]
    },
    {
      "event_id": "401869950",
      "risks": [
        {
          "severity": "MEDIUM",
          "risk": "ODU offensive-line availability needs pregame confirmation",
          "detail": "Connor Drake missed the prior game with an injury but is listed on the current chart. Protection effects remain unestimated. Henicle has returned; no quarterback deduction applies.",
          "markets": [
            "winner",
            "spread",
            "total"
          ],
          "resolved": false
        }
      ]
    },
    {
      "event_id": "401860923",
      "risks": [
        {
          "severity": "HIGH",
          "risk": "Colorado State quarterback and receiver availability remain unresolved",
          "detail": "Hejny is reported questionable and Vick was described as probably doubtful by his coach. Preserve zero, minus-three and minus-six conditional endpoints. A final official report and exact redistribution are unavailable. Mel Brown was reported probable, without a verified material limitation. Live selections remain PASS.",
          "markets": [
            "winner",
            "spread",
            "total"
          ],
          "resolved": false
        }
      ]
    }
  ]
}